Startup Time for Fukushima’s Frozen Wall

Japan’s TEPCO — operator of the stricken Fukushima nuclear power plant — is about to flip the switch on its infamous ‘ice wall’ intended to divert flowing groundwater around its crippled reactors and thus stem groundwater contamination at the site. The widely mischaracterized and maligned installation—which is a barrier of frozen soil rather than a wall of ice—has every chance of delivering the hoped for results, according to radiation cleanup experts at U.S. national laboratories and feedback from initial system tests. “The frozen barrier is going to work,” predicts Brian Looney, senior advisory engineer at the U.S. Department of Energy’s Savannah River National Laboratory in South Carolina and co-author of an independent assessment of TEPCO’s frozen barrier. Continue reading “Startup Time for Fukushima’s Frozen Wall”